Customization: | Available |
---|---|
After-sales Service: | Online Technical Service, Field Training Service |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Rotary pile drilling rig is a kind of large-scale construction machinery, which is mainly used to drill piles in the foundation of buildings, bridges, roads and other structures.
Our rotary drilling rig working range is for 500~1500mm pile diameter and within 50meters depth, adopts pressurized drilling mode, high drilling efficiency, good pore-forming quality; equiped with heavy duty crawler chassis, reliable quality, flexible in construction, suitable for various pile foundation works.
SR-825 Rotary pile drilling rigs are widely used in construction engineering because they can drill deep holes quickly and accurately. They are often used in foundation engineering, bridge construction, high-rise building construction, and offshore engineering. In addition, they can also be used for drilling monitoring wells, anchors, and soil nails in geotechnical engineering.
1.SR-825 crawler type rotary drilling rig adopt pressurized drilling mode, enabling rotary drilling depth is 25m. matching the different specifications of drilling tools, pile hole diameter range up to 500-1500mm.
2.It has high drilling efficiency ,and After construction, It can quickly move to next worksite . flexible, convenient and efficient, is a national high-speed rail construction-specific piling machinery equipment.
3.This machine is applicable to soil, clay, fill soil, silt, silt layer, and some strata contain pebbles, gravel; widely used in high-speed rail trestle piles, slop shield piles, photovoltaic power station foundation pile, power grids, civil construction, new rural construction, municipal construction, landscaping and other projects.
1.Flexible: the whole tonnage is small, simple operating, moving fast, convenient transition, etc features.
2.High returns: small investment, quick gains, economic advantages can not be replaced.
3.Technology patents: patent uses a unique technology to achieve a small torque but big power characteristics, thus achieve a small machine to drill big piling hole.
Model | SR-825 |
Working mode | hydraulic oil cylinder pressure |
Drilling diameter | 500-1500mm |
drilling depth | 25m |
Power head max output torque | 120KN.m |
Rotary speed | 10-50r/min |
Main winch max lifting force | 120KN |
Main winch max lifting speed | 70m/min |
Wire rope diameter | 24mm |
Auxiliary winch max. Lifting force | 30Kn |
Auxiliary winch max. Lifting speed | 50m/min |
Wire rope diameter | 12mm |
Pressurized oil cylinder max press capacity | 100KN |
Pressurized oil cylinder max lifting force | 100KN |
Pressurized oil cylinder stroke | 2500mm |
Walking speed | 5km/h |
Max. Climbing angle | 30° |
System pressure | 28Mpa |
Diesel engine power | 151KW ,Cummins ,water cooling ,turbo charger |
Working radius | 4m |
Diamension | 11000X2800X3450mm |
Total weight (t) | 25T |